At the ninth China International Import Expo, EVE Energy and Intel shared a booth to show something that normally gets split across two procurement teams: a data center cabin where the compute platform and the battery backup are designed together rather than bolted together afterwards.

The argument behind it is simple enough. AI workloads have made power the binding constraint, not the chip. A cluster that once drew a steady load now swings hard and fast, and the grid connection available at most sites was sized for the old profile.

Why Backup Stopped Being an Accessory

The load profile changed first

Training and inference clusters pull power in bursts. Ramp rates that were tolerable for a general-purpose server hall are not tolerable for a rack of accelerators, and a voltage dip that a CPU would ride through can drop a job that has been running for hours.

Sizing follows the profile

That pushes the backup system from "installed capacity" thinking toward "discharge rate" thinking. A cabinet rated for a slow, deep discharge is the wrong tool when the requirement is a short, violent one. This is the gap the two companies are aiming at.

Inside the Pandun 6C Backup Cabinet

EVE brought its Pandun 6C to the booth, built for 800V HVDC lithium iron phosphate battery​ short-time backup duty.

What a 6C rating buys you

The cabinet supports 4C to 6C discharge and delivers 620kW per unit, with a 15-year design life. In practice that means fewer cabinets per hall, and a shorter window between the moment the grid fails and the moment the batteries have to be at full output.

The safety architecture is the harder part

High-rate discharge concentrates heat, so the cabinet uses compartmented thermal insulation and a dual fire-protection design to build a thermal-runaway protection layer, backed by three-layer BMS management.

The commercial numbers EVE quotes are worth noting because they are the ones a facility team actually argues about: roughly 80% lower O&M cost, 70% less floor space, parallel expansion to 12 cabinets, and factory-assembled units that shorten on-site work.

The Whole Chain, Not Just the Cabinet

A single cabinet is not a solution. EVE laid out the rest of the chain alongside it: a 5MWh battery energy storage system, BBU modules, and high-rate lithium battery​ cells intended for data center duty.

Read together, the three layers cover the generation and grid side, the distribution side, and the cabinet side. That matters for anyone specifying AI data center energy storage, because the failure modes at each layer are different and a supplier who only covers one of them leaves the integration work to the customer.

The Container Itself

The integrated system is built as a standardized, modular container with an Intel-architecture CPU compute platform at its center, which is where the "compute-power coordination" framing comes from. EVE supplies the storage side end to end, from cell through backup cabinet to system, and works against Intel's platform and open ecosystem to improve how well energy storage solutions​ match the compute load.

The stated goal is nearby deployment: green power consumed where it is generated, inference running close to the user, and a lower lifecycle cost for the facility as a whole.

What Joining Intel's Ecosystem Actually Means

The collaboration marks EVE's formal entry into Intel's global open ecosystem. From this expo onward, the two plan joint R&D and scenario deployment, using the "containerized compute cabin plus storage modules" combination as the carrier for refining technical fit.

The target regions are those with abundant green power and rising compute demand. The target pain points are the familiar ones in traditional data center builds: construction cycles measured in years, and capex committed long before demand is confirmed. Modular containerized data center power​ is the proposed answer to both.

The Direction of Travel

The framing both companies used is that AIDC should move from "stacking compute" to "coordinating compute and power." Whether that becomes an industry standard or stays a marketing line depends on how the next few deployments perform, but the underlying problem is real: at current growth rates, the power side of AI infrastructure is no longer the part you specify last.

If you are scoping AI data center energy storage, battery energy storage system​ capacity, or high-rate lithium battery​ supply for backup duty, our team can walk through the cell-level and cabinet-level options with you.

 

 

 

Inquiry more product details from the : ​Lithium Ion Battery Manufacturers